Home About us Services Instruments Clientage Contact us
 
S.NO
DETAILS OF WORK EXECUTED/CLIENTS
YEAR
AREA/LENGTH

21

Providing Survey Services to M/s. Hawk Pakistan Co at Dureji test well, access road and well site of Premier Oil Pakistan Ltd. From April-June 2000.

2000

 

22

Pipeline route survey from LASMO well K-11 to K-10 at (Kandanwari) for M/s. DESCON.

2000

2.5 Km

23

Detail survey of water ponds on existing SSGC pipeline at MP-106 and MP-121 for M/s. Geo-Technique.

2000

3 Km

24.

Providing survey services to M/s. SIEMENS Pakistan Ltd at secondary runway Karachi Airport since Feb 99 – Aug 2000.

1999-2000

 

25.

Providing Survey services to M/s. Pipelink Construction (Pvt) Ltd at construction project of BHP/ZAMZAMA Flow line pipeline project Dadu from Oct 2000 – Mar 2001

2000-01

13 Km

   26.

Re-route and alignment of existing pipeline route at Kandanwari/Miano field development project for M/s. Descon Engineering Limited.

2000

45 Km

  27.

Providing survey services to M/s. SIEMENS Pakistan at Bosigar Oil Refinery Project from Oct 2000

2000-01

 

   28.

Providing survey services to M/s. Pipelink Construction (Pvt) Ltd at construction project of Kandanwari.Miano Field Development Pipeline Project from Nov 00 – Aug 01.

2000-01

45 Km

29.

Route & Topographic survey of Pipeline from LASMO well K-11 – K-12, (Kadanwari) for J-Tech (Private) Ltd.

2001

1.5 Km

30.

Reconnaissance & Detailed Pipeline Route survey of LASMO K-13 well to Kadanwari Gas Plant. (J-Tech (Private) Ltd.)

2001

15 Km

31.

Route & Topographic survey of wastewater pipeline from Kadanwari Gas Plant to K-5 well. (DESCON)

2001

1 Km

32.

As-Built survey of Kadanwari gas Plant. for(DESCON)

2001

 

33.

Physical and Population Density survey K-13 well (2 Km radius) for LASMO Oil Pakistan Ltd.

2001

 

34.

Reconnaissance survey of existing Pipeline routes from Kadanwari Gas Plant to K-1, K-3 & K-6 wells for LASMO Oil Pakistan Ltd.

2001

8 Km

35.

Establishing Control points with GPS System 500 along the Route of RBOD Canal for (MMP)

2002

273 Km

36.

As-Built survey of Existing CFS yard for Pak-Shaheen Container Services.

2002

 

37.

Detailed Route & Topographic Survey of M-1 & M-6 Pipeline routes in Kadanwari for OMV (Pakistan).

2002

4.5 Km

38.

Detailed Route Survey of K-4 U-Dip Pipeline in Kadanwari for LASMO Oil Pakistan Ltd.

2002

1.5 Km

39.

Digital Base Mapping of villages in Northern and Southern Punjab, for PUNJAB COMMUNITY WATER SUPPLY AND SANITATION PROJECT, for Innovative Consultants (Pvt.) Ltd, LHR.

2002

 

40.

Route Analysis Survey report from Peshawar To Kabul for Pak Shaheen Group of Co’s, Khi.

2002

300 Km


Previous Page 1 | 2 | 3 | 4 | 5 | 6 Next