S.NO |
DETAILS OF WORK EXECUTED/CLIENTS |
YEAR |
AREA/LENGTH |
1. |
Route Alignment & Leveling of Minor Canals and Drains at Rupa, Umrani and Magsi Distributaries of Pat feeder Canal Rehabilitation project for Zaheeruddin Consultants (Pvt.) Ltd. |
1995/96 |
200 Kms |
2. |
Boundary Demarcation and Topographic survey of BOC plant at Port Qasim Industrial Area for BOC Pakistan Ltd. |
1996 |
50 Acres |
3. |
Topographical survey of SZABIST land at link road for Zaheeruddin Consultants (Pvt) Ltd. |
1996 |
300 Acres |
4. |
Topographical Survey of Boat Basin lake and surroundings at Clifton, Karachi for Arshad Shahid Abdullah & Associates. |
1996 |
320 Acres |
5. |
As-Built Survey of HUBCO oil Pipeline for PROCON |
1996 |
10 Km |
6. |
Providing Survey services along with surveying instruments for laying Gas Pipeline from UCH Gas field to Uch Power Plant for Clough Engineering Ltd. |
1996-97 |
47 Km |
7. |
Preliminary and detailed survey of pipeline route from Khudadad well # 1 to Khuar tank farm for Pakistan Oilfields Ltd. |
1997 |
31 Km |
9. |
Route and topographic survey of proposed pipeline from Turkwal well # 1 to Pindori station for Pakistan Oil Fields Ltd. |
1997 |
16 Km |
10. |
Demarcation of Flat Sites of DHA Housing scheme for Arshad Shahid Abdullah & Associates. |
1997 |
50 Acres |
11. |
Route Alignment and topography of Sewerage Disposal system at ICI PTA Plant, Port Qasim Industrial Area for M/s.Fosterwheeler.c/o M/s. Shahab Ghani & Associates. |
1997 |
3 Km |
12. |
Route and Topographic survey of White Oil Pipeline Project (Karachi-Mahmmodkot) for M/s. Asia Petroleum Limited. Was awarded, but due to some problems with the Govt. the project was suspended by Asia Petroleum Limited. |
1998 |
840 Km |
13. |
Topographical survey of existing drainage system at Karachi Golf Club Limited for KGCL. |
1998 |
2.5 Km |
14. |
As-Built survey of Dadabhoy Cement Factory at Nooriabad Industrial Area. |
1998 |
100 Acres |
15. |
Preparing shop drawings for electrical work for installation of Runway Lighting on CAD. For M/s. SIEMENS Pakistan. |
1999 |
|
16 |
Route & Topographic survey of Pipeline, Kandanwari/Miano Field Development Project for M/s. Geo-Research, Lahore. |
1999 |
45 Km |
17 |
As built survey of LASMO well sites Miano-2, Khipro-I and Lasmo Gas Plant at Kandanwari for M/s. Geo-Research, Lahore |
1999 |
|
18 |
Route Alignment & Topographic survey of Northern Bypass (M-10) Motorway for M/s. National Engineering Services Pakistan (Pvt.) Ltd. |
1999 |
61 Km |
19 |
Reconnaissance of Pasni-Turbat Road for M/s. National Engineering Services Pakistan (Pvt.) ltd. |
1999 |
134 Km |
20 |
Providing Survey Services to M/s. SIEMENS Pakistan Ltd at FOF Gantry at PRL from March – May 2000 |
2000 |
|